Building name: Píer de São Sebastião (Pier of São Sebastião)
Year: 2011-2013
Location: São Sebastião/SP
Description: Recovery of the terminal’s reinforced and prestressed concrete structures in the surfaced parts, and in the metal and concrete piles in submerged part; structural reinforcement and treatment.